Ops Shift Transition: 09/18/2019, Day Shift 15:00 – 23:00 (08:00-16:00) - UTC (PT)
State of H1: Locked
Intent Bit: Oberving
Weather: 0-5 mph wind
Primary 0.03 – 0.1Hz: 0.01 um/s, receding after EQ
Secondary 0.1 – 0.3Hz: 0.2 um/s
Outgoing Operator: Cheryl
Quick Summary: Locked and Observing for ~ 9 hours. Microseism up over the last ten hours.