Reports until 16:38, Wednesday 18 September 2019
H1 General
edmond.merilh@LIGO.ORG - posted 16:38, Wednesday 18 September 2019 (52022)
Shift Transition - Eve

TITLE: 09/18 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Commissioning
OUTGOING OPERATOR: Niko
CURRENT ENVIRONMENT:
    SEI_CONF state: WINDY
    Wind: 9mph Gusts, 6mph 5min avg
    Primary useism: 0.03 μm/s
    Secondary useism: 0.24 μm/s
QUICK SUMMARY:

Some commissioning going on while Livingston was doing calibration and a power outage at LLO prompted a bit longer period for us.