TITLE: 09/20 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 114Mpc
OUTGOING OPERATOR: Niko
CURRENT ENVIRONMENT:
SEI_CONF state: WINDY
Wind: 6mph Gusts, 5mph 5min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.17 μm/s
QUICK SUMMARY:
Can not connect to TeamSpeak.
H0:FMC-MX_AH_COOLTEMP_2_DEGF is invalid.
H1:GRD-SQZ_MANAGER_USERMSG: green power stabilization railed
Robert has PEM injections scheduled for 10 AM.