Reports until 16:12, Monday 23 September 2019
LHO General
patrick.thomas@LIGO.ORG - posted 16:12, Monday 23 September 2019 (52082)
Ops Day Shift Summary
TITLE: 09/23 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 112Mpc
INCOMING OPERATOR: Ed
SHIFT SUMMARY: Remained locked entire shift. Out of observing only for PEM commissioning.
LOG:

17:46 - 18:19 UTC Kyle to mid Y to retrieve scroll pump
18:25 UTC Dan and Craig to optics lab
18:44 - 18:58 UTC Filiberto opening OSB receiving rollup door
19:00 UTC Changed to commissioning for PEM
19:58 UTC Karen driving to wood shop
19:59 UTC PEM done. Back to observing
20:12 UTC Dave opening OSB receiving rollup door
22:11 - 22:41 UTC Gerardo to mid Y to look for parts
~23:00 Large freight truck through gate and to OSB receiving area. Redirected to LSB receiving.