prepared anchor holes for new XBM turbo station

{Gerardo, Tyler, Kyle, Chandra, in various phases and combinations}

Core drilled the three remaining anchor locations at x-beam manifold turbo station and installed the threaded inserts. The existing turbo frame was cut via band saw to make clearance for Hilti equipment. Custom mods to one or two anchor brackets are required for this station due to core drill clearance issues.