TITLE: 09/24 Day Shift 15:00 – 23:00 (08:00-16:00), all times posted in UTC
STATE of H1: Tuesday Maintenance
INCOMING OPERATOR: Ed
SHIFT SUMMARY: Tuesday maintenance went until ~1:30pm. Initial alignment had some hiccups with a stalled ETMY, then we had the standard CARM_TO_TR lockloss, and then made it up to NLN for one minute before losing lock. Brought it up to TRANSITION_TO_ETMX before 6.1 EQ near Madagascar knocked us out.
LOG:
15:01 (08:01) Tyler to LVEA -- start crane maintenance
15:02 (08:02) Chris to LVEA -- set up forklifts
15:04 (08:04) Chandra to LVEA -- start cutting/drilling work
15:06 (08:06) Vanessa to LVEA
15:09 (08:09) Richard, Ken to EX -- PEM coil install prep
15:16 (08:16) Karen to EY
15:23 (08:23) Betsy to LVEA -- check laser barriers
15:34 (08:34) Jim, Gavin to end stations -- test fit BRS heater
15:38 (08:34) Cheryl to Optics Lab/PSL enclosure -- Adjust IO High Power Beam Dump hoses (phone/paging system on in PSL enclosure)
15:41 (08:41) Pest control spraying around OSB/LSB for ~1hr
15:41 (08:41) Betsy out of LVEA
15:42 (08:42) Hugh to LVEA -- extract iLIGO equipment
15:46 (08:46) Gerardo to LVEA -- help with drilling work
15:48 (08:48) Corey to LVEA -- help Chris with HAM6 work