Reports until 16:51, Tuesday 22 January 2013
H1 CDS
james.batch@LIGO.ORG - posted 16:51, Tuesday 22 January 2013 (5212)
Moved power for vacuum controls network switch to UPS
The network switch for vacuum controls in the MSR as well as several other devices were powered by normal AC power.  The power strip for all devices was moved to a UPS powered outlet to allow operation during brief power failures.  This did not cause an interruption for the vacuum network since the switch had dual power supplies, but other services were interrupted for about 2 seconds.  Nobody noticed.