Displaying report 1-1 of 1.
Reports until 16:50, Monday 30 September 2019
LHO General
patrick.thomas@LIGO.ORG - posted 16:50, Monday 30 September 2019 (52214)
Ops Eve Shift Transition
TITLE: 09/30 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Observing at 114Mpc
OUTGOING OPERATOR: Cheryl
CURRENT ENVIRONMENT:
    SEI_CONF state: WINDY_NO_BRSX
    Wind: 15mph Gusts, 12mph 5min avg
    Primary useism: 0.06 μm/s
    Secondary useism: 0.12 μm/s 
QUICK SUMMARY: Running SEI_CONF in WINDY_NO_BRSX since BRSX is in fault.
Displaying report 1-1 of 1.