Displaying report 1-1 of 1.
Reports until 17:38, Tuesday 01 October 2019
H1 AOS
dripta.bhattacharjee@LIGO.ORG - posted 17:38, Tuesday 01 October 2019 (52255)
PCal End_Y measurements on 1st Oct,2019
Rick, Ethan, Vladimir, Dripta

On Tuesday we performed an EY end station calibration. The measurement procedure/log and a picture of the beam alignment on the RX integrating sphere aperture are attached. Looks similar to the spot position in alog 51106.

Analysis of the calibration data seems in line with the last few calibration measurements we've performed.  
Images attached to this report
Non-image files attached to this report
Displaying report 1-1 of 1.