Hugh and I locked the B, C, and D lockers on the HAM6 ISI this morning. The A locker was inaccessible with only the North and East doors off. The attached screenshot shows the CPS residuals in nm and nrads.
Note, Kyle, Gerardo, Tyler, and Rahul doors off by about 10am this morning, Hugh and TJ were on lockers shortly after and the SQZ team went in for some pre measurements before lunch.