{Bubba, Tyler, Chris, Chub, Jordan, Chandra}
BSC8 flat door is installed (D1800205) and annulus is being pumped down. Blew down purged air in YBM volume and measured -31.4degC dew point. Needed to rework some of the custom signal cable to enable safety valve so we will start roughing out volume tomorrow.
BSC 7,8 doors were cleaned and baked at LHO and FTIR samples passed test at JPL. Results in DCC under E1900248.