TITLE: 10/04 Day Shift 15:00 – 23:00 (08:00-16:00), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Quiet engineering day, XB/YB manifolds pumping down, PSL pick-off work ongoing, Ncal work ongoing, beam alignment check complete
LOG:
15:17 (08:17) Chandra to LVEA -- start pumping YB manifold
15:27 (08:27) Chris moving boxes with forklift in high bay
16:18 (09:18) Ed to LVEA -- take pictures of NHZ
16:31 (09:31) Ed out of LVEA
16:36 (09:36) Timesh to Optics Lab -- Ncal work
16:56 (09:56) Timesh to Optics Lab -- Ncal work
17:02 (10:02) Richard, Ed to LVEA -- transition to laser hazard
17:08 (10:08) TJ, Betsy, Jenne, Nutsinee, Keita to LVEA -- beam alignment check
17:11 (10:11) Chris to MX -- move equipment into storage
17:36 (10:36) Chandra to EX -- check on pump
17:44 (10:44) Sheila, Fabrice to Optics Lab -- grab fiber to ship to MIT
17:45 (10:45) Karen to MY
17:55 (10:55) Karen leaving MY
17:56 (10:56) Sheila, Fabrice out of Optics Lab
18:22 (11:22) Fil to LVEA -- answer Fast Shutter HV questions
18:27 (11:27) Richard to LVEA -- check with beam alignment team
18:32 (11:32) Georgia to Optics Lab -- search for ND 2 filters
Picometer HV turned on
18:37 (11:37) Georgia back from Optics Lab
18:38 (11:38) Richard out of LVEA
18:39 (11:39) Georgia, Jason to PSL enclosure -- ALS bypass pick-off work
18:43 (11:43) Chris back from MX
18:47 (11:47) Hugh, Charlie to Optics Lab -- calibrate fume hoods
18:48 (11:48) Richard out of LVEA -- beam alignment work done
18:50 (11:50) TJ, Jenne, Betsy, Keita out of LVEA
19:05 (12:05) Karen to H2 electronics building
19:19 (12:19) Karen back from H2 electronics building
20:19 (13:19) Fil to CER -- pull SQZ slow control chassis 3 for modifications
20:44 (13:44) Timesh, Rick to Optics Lab -- Ncal
20:56 (13:56) Georgia, Jason out of PSL enclosure
22:19 (15:19) Georgia, Jason to PSL enclosure
22:34 (15:34) Timesh to Optics Lab -- Ncal work
22:59 (15:59) Betsy to LVEA -- check work progress