Started pumpind down YBM this morning with temporary adapter cable that Kyle made to send QDP80 motor run signal to turbo station for safety valve interlocking (old pumps using new signal cable). Pressure is currently 0.9 Torr. Will valve out for the weekend and resume pumping Monday morning.