{Chub, Jordan, Chandra}
We are in the process of replacing XBM turbo. Decoupled old pump and removed the six way cross that is needed for new pump. Cross is currently finger tight on turbo fixation (on the one and only rotatable flange in system). Will resume Monday with bolting to 10" gate valve and populating ports. Kyle was able to route 208V power to stand to test turbo ahead of time. It spun up suspiciously slow, but did come to full speed. May be a function of foreline pressure or a function of hunger due to late lunch. Thanks to Tyler for helping us rig the new stand and crane over XBM spool.