Daniel, Dave:
Daniel made a h1sqz model change to add four new ISS filtermodules ( CTRL and ERR for CLF and OPO). He also made the corresponding change to the Beckhoff C1PLC4.
Between the times of 12:24 and 12:35 PDT I restarted the following:
h1sqz model
DAQ, followed quicked by h1edc
Note that h1nds3 (stand-alone EDCU) was not restarted. This system does not have the new PLC4 slow channels.
I took the opportunity to restart a stuck Slow-Controls SDF system (h1sysecatc1plc1sdf).