Reports until 16:03, Monday 07 October 2019
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:03, Monday 07 October 2019 - last comment - 17:00, Monday 07 October 2019(52332)
Ops Day Shift Summary
Ops Shift Log: 10/07/2019, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Unlocked
Intent Bit: Planned Engineering
Support: N/A
Incoming Operator: N/A
Shift Summary: HAM5/6 viewport was replaced. Chamber doors are on and the vacuum team has started pump down. The H2 vertex is being vented to atmosphere.  
 
Activity Log: Time - UTC (PT)
15:00 (08:00) Start of Shift
15:12 (08:12) Chandra & Tyler – To LVEA – Start Y-Beam Turbo, vent the Vertex
15:50 (08:50) Chandra & Tyler – Out of the LVEA
15:52 (08:52) Richard – Going to CER to check the High Voltage is off
15:58 (08:48) Richard – Out of the CER
17:09 (10:09) Chris – Going to all out buildings to swap out fire extinguishers
17:13 (10:13) Georgia & Dan B. – Going into the Optics Lab
17:18 (10:18) Kyle – VAC team is venting the vertex
17:24 (10:24) Hugh – Going to End-Y to work on the wind fence
17:28 (10:28) Niko – Going to Optics Lab
17:31 (10:31) Tyler – Going into the LVEA to prep for equipment moves
17:38 (10:38) Rick & Timesh – Going to End-X for NCal fit checks
17:43 (10:43) Travis & Gerardo – Staging the replacement viewport in the LVEA
17:48 (10:48) Niko – Out of the Optics Lab
17:49 (10:49) Niko – Going to End-X for PCal calibration work
17:52 (10:52) Hugh – Back from End-Y
17:58 (10:58) Travis – Out of the LVEA
18:02 (11:02) Georgia & Dan – Out of the Optics Lab
18:06 (11:06) Rick – Transition to Laser Hazard at End-X
18:49 (11:49) Chris – Back from fire extinguishers swap
19:31 (12:31) Dave – Restarting the SQZ model and then the DAQ
19:43 (12:43) Betsy, Corey, & Travis – Going to HAM6 to prep for viewport swap
19:50 (12:50) Rick & Timesh – Back from End-X
19:58 (12:58) Dan & Cao – Going into the Optics Lab
20:03 (13:03) Jeff J. – Doing a walkthrough of the LVEA
20:05 (13:05) Niko – Finished at End-X – Transitioned back to Laser Safe
20:16 (13:16) Chris & Tyler – Moving scissors from End-Y to CS High Bay
20:29 (13:29) Jeff J. – Out of the LVEA
20:45 (13:45) Betsy & Travis – Going back into LVEA to work on viewport installation
21:19 (14:19) Patrick & Timesh – Taking NCal setup into the Optics Lab
21:25 (14:25) Tyler – From drilling company on site to meet with Hugh
21:30 (14:30) Richard – Going into the LVEA
21:36 (14:36) Cheryl – Going into the LVEA to get Betsy’s signoff on WP to open ISCT1 #8401
21:40 (14:40) Niko – Going to End-Y to make PCal measurements
21:52 (14:52) Daniel, Sheila, & Richard – Going into the CER to work on Squeezer electronics
22:08 (15:08) Travis – Out of the LVEA
22:12 (15:12) Betsy, Corey, & Gerardo – Out of the LVEA – Finished with viewport install
22:15 (15:15) Rahul – Escorting new hires from the business office on LVEA tour
22:25 (15:25) Daniel, Sheila, Richard – Out of the CER
22:30 (15:30) Sheryl – Out of the LVEA
23:00 (16:00) End of Shift
Comments related to this report
betsy.weaver@LIGO.ORG - 17:00, Monday 07 October 2019 (52335)

To clarify, HAM6 doors are still off. HAM5 doors were never removed. Septum window viewport assembly was swapped and the corner (minus HAM6) is now in the vacuum teams hands for pump down.