Reports until 16:03, Tuesday 08 October 2019
H1 General
edmond.merilh@LIGO.ORG - posted 16:03, Tuesday 08 October 2019 (52347)
Shift Summary - Day

TITLE: 10/08 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Cheryl
SHIFT SUMMARY:
LOG:

14:32 Jeff B out to ends  - DM checks & flow testing

15:12 Chandra and Tyler out to LVEA

15:25 Chub and Jordan out to LVEA

15:35 Gerardo out to LVEA -  N side of HAM 5

15:44 Chris using forklift by Rear high-bay to move spool pieces

15:45 Chandra just informed me that there is to be NO work in HAM6 at all today due to vac team "roughing" out the vertex.

15:5 untripped everything except for HAM6 because the ISI is locked

16:00 Paradise water delivery on site

16:07 Christina out to LVEA -checking on / assisting with cleaning

16:25 Placed all SUS in HAM6 to SAFE

16:29 Chris back and out to LVEA

16:33 Unifirst on site

16:40 Nutsinee out to LVEA- SQZT6

16:50 Jeff B back and out to LVEA fo DM - also DR and optics lab

17:00 Dan and Cao out to optics lab

17:10 Gerardo back - taking some gear to MX

17:23 Corey out to check on the TCS chillers

17:33 Hugh out to HAM7

17:34 Corey back

17:40 Jeff B back

18:00 Corey out to LVEA - HAM7

19:01 Christina forklifting a pallette over to the H2 building

19:08 Corey and Hugh back

20:52 Tyler back - heading to mid stations

21:07 Hugh and Gavin out to HAM7

21:18 Travis to MX

21:33 Richard to HAM6 to check on Filiberto

21:35 Tyler back from mid stations

21:52 Chandra leak checking Y beam manifold

21:57 Travis back from mid X

 