TITLE: 10/09 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
I spelled Ed off at 10am & Patrick came in starting at 11am. Below are activities I noted while I was in the chair.
LOG:
- Corey spelling Ed at 17:00utc (10am).
- MX Scaffolding continues (Bubba)
- 15:30 - 17:13 HAM11 & 12 bolt removal (Chubb & Jordan)
- 17:32 Out to MX for GV work, WP8405 (Chandra)
- This is on hold until scaffolding complete.
- 17:38 Out to mids & ends for fire panel checks (Fil)
- 17:38 Cleanroom measurements in LVEA (Christina, Vanessa)
- 17:41 SRM going to ALIGNED state (Rahul, Betsy)
- 17:53 Ncal drilling at EX (Rick,Timesh)
- 17:54 Turbo stand work at corner station (chandra, chubb, jordan)