Displaying report 1-1 of 1.
Reports until 16:04, Thursday 10 October 2019
H1 General
edmond.merilh@LIGO.ORG - posted 16:04, Thursday 10 October 2019 (52392)
Shift Summary - Day

TITLE: 10/10 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Cheryl
SHIFT SUMMARY:
LOG:

14:57 Timesh at EX

15:00 Vanessa and Karen cleaning in LVEA

15:20 Karen and Vanessa out.

15:30 Chandra out to LVEA

15:48 Gerardo out to LVEA to join Chandra

16:02 Gerardo back

16:03 Gerardo, Chub , and Jordan to MX

16:10 Jeff K out to EX

16:17 Chandra back

16:35 Chandra out to MX

16:33 LVEA still LASER HAZARD

16:37 Jeff K back

16:43 Timesh back

18:58 Jason out to MY

17:01 Corey, Phillipe, ad Gavin out to EX

17:05 Jason back

17:10 HAM6 will be available for in-chamber work after 1:30PM PDT

18:28 Richard out to LVEA to open PSL and ALS  light pipes and turn on TCS lasers - LVEA will remain in LASER HAZARD

18:34 Re-Locking of IMC

18:36 IMC locked and WFS are cooking the alignment

18:49 Jeff, Charlie, and Cheryl out to LVEA to inspect for ladder setups.

18:55 Corey, Gavin and Phillipe back

18:57 Jim and Hugh have been at EY fr some time mapping for wind fence

18:59 TCSX having chiller flow issue - TJ investigating -no flow issue: alarm not reset

19:37 Cheryl, Charlie and Jeff back

19:48 TJ, Cao, and Dan out to replace TCSY flow meter.

20:17 Nuts out to LVEA

20:42 Fil out to EX to pull BRS and NCAL cables

21:!5 Nuts out to LVEA

22:06 Niko, Vlad, and Rick headed out to EY to align Pcal input and turn on ALSY

22:09 TJ out to EX to turn on ALSX

22:20 Cheryl out to LVEA to look for a ladder

22:44 Timesh and Gavin out to EX to retrieve equipment

22:46 Cheryl back

Displaying report 1-1 of 1.