TITLE: 10/10 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Cheryl
SHIFT SUMMARY:
LOG:
14:57 Timesh at EX
15:00 Vanessa and Karen cleaning in LVEA
15:20 Karen and Vanessa out.
15:30 Chandra out to LVEA
15:48 Gerardo out to LVEA to join Chandra
16:02 Gerardo back
16:03 Gerardo, Chub , and Jordan to MX
16:10 Jeff K out to EX
16:17 Chandra back
16:35 Chandra out to MX
16:33 LVEA still LASER HAZARD
16:37 Jeff K back
16:43 Timesh back
18:58 Jason out to MY
17:01 Corey, Phillipe, ad Gavin out to EX
17:05 Jason back
17:10 HAM6 will be available for in-chamber work after 1:30PM PDT
18:28 Richard out to LVEA to open PSL and ALS light pipes and turn on TCS lasers - LVEA will remain in LASER HAZARD
18:34 Re-Locking of IMC
18:36 IMC locked and WFS are cooking the alignment
18:49 Jeff, Charlie, and Cheryl out to LVEA to inspect for ladder setups.
18:55 Corey, Gavin and Phillipe back
18:57 Jim and Hugh have been at EY fr some time mapping for wind fence
18:59 TCSX having chiller flow issue - TJ investigating -no flow issue: alarm not reset
19:37 Cheryl, Charlie and Jeff back
19:48 TJ, Cao, and Dan out to replace TCSY flow meter.
20:17 Nuts out to LVEA
20:42 Fil out to EX to pull BRS and NCAL cables
21:!5 Nuts out to LVEA
22:06 Niko, Vlad, and Rick headed out to EY to align Pcal input and turn on ALSY
22:09 TJ out to EX to turn on ALSX
22:20 Cheryl out to LVEA to look for a ladder
22:44 Timesh and Gavin out to EX to retrieve equipment
22:46 Cheryl back