(Chub, Jordan, Gerardo)
Re-installed IP10 on top of the new VAT valve. The joint was torqued down metal to metal, the joint still needs to be leak tested.
(Kyle, Gerardo)
Connected an aux cart to IP10 to pump it down to rough vacuum. Once at rough vacuum IP10 was isolated via it's two metal valves, we will continue with IP10 pump down on Monday.