Ops Shift Log: 10/14/2019, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Unlocked
Intent Bit: Engineering
Support: N/A
Incoming Operator: N/A
Shift Summary: Doors are on HAM6, and pump down is getting underway. CDS continues working on the Dolphin problems at End-Y. Wind fence installation materials have arrived and been distributed to the end stations. The drilling company is on site, working at End-X. The LVEA was put into Laser Safe with the light pipe open. Other post vent recovery work continues.
Activity Log: Time - UTC (PT)
14:35 (07:35) Tyler & Chris – Going into the LVEA for HAM12 door work
14:59 (07:59) Vanessa – Going into the LVEA
15:00 (08:00) Start of shift
15:20 (08:20) Karen – Going into the LVEA
15:43 (08:43) Corey – Going to check TCS chillers (FAMIS task)
15:50 (08:50) Corey – Back from checking TCS chillers
15:53 (08:53) Hugh – Going to End-X for wind fence work
Several contractors and deliveries today for the wind fence install
16:30 (09:30) Vanessa – Going to End and Mid X for cleaning
16:40 (09:40) Dave & Eric – Going to End-Y for Dolphin swap
16:40 (09:40) Niko – Going into the Optics Lab
16:46 (09:46) Niko – Out of the Optics Lab
16:47 (09:47) Corey – Going into LVEA for HAM6 door install
16:58 (09:58) Dan B. – Going to table at HAM6
17:14(10:14) Timesh - Going into the Optics Lab
17:20 (10:20) TJ - Going into the CER and LVEA to turn on TCS high voltage
17:32 (10:32) TJ – Out of the CER
17:44 (10:44) Karen – Going to End-Y
17:46 (10:46) Gerardo – Going to HAM5/6 area
17:55 (10:55) Corey – Out of the LVEA
HAM6 door is back on. Annulus pumping is getting started
18:27 (11:27) Chandra – Going to check on HAM12 door removal
18:29 (11:29) Karen – Finished at End-Y – coming back to CS
18:30 (11:30) Corey – Going into the LVEA to take pictures of HAM12 internals
18:36 (11:36) Marc – Going to Mid-Y to get parts
18:42 (11:42) Niko & Vlad – Going into the Optics Lab
18:57 (11:57) Marc – Back from Mid-Y
19:04 (12:04) Niko & Vlad – Out of the Optics Lab
19:04 (12:04) Corey – Out of the LVEA
19:05 (12:05) Cheryl – Going into the PSL Enclosure
19:08 (12:08) Filiberto & TJ – Into the CER
19:15 (12:15) TJ & Filiberto – Out of the CER
19:25 (12:25) Jeff J. – Going to End-X to check of wind fence install
19:28 (12:28) Jason – Going into the PSL Enclosure
20:05 (13:05) Filiberto – NCal work at End-X will shut off high voltage for the NCal
20:10 (13:10) Dave – Going out to End-Y to swap out cards as part of Dolphin swap
20:31 (13:31) Daniel S. & Team – Going into LVEA to reposition ISCTC6 table
21:06 (14:06) Sheila – Going to check on HAM6 ISC table move
21:31 (14:31) Daniel S. & Team – Out of the LVEA – The table has been moved back into position
21:27 (14:47) Ed – Going into LVEA to check for Laser Safe before opening light pipe. (WP #8422)
21:50 (14:50) Chandra – Going into the LVEA to prep for HAM6 pump down (WP #8421)
22:15 (15:15) Ed – Transitioned the LVEA to Laser Safe with the light pipe open
22:18 (15:18) Sheila – Going into the LVEA to start Squeezer Laser
22:40 (15:40) Shelia – Out of the LVEA
23:00 (16:00) End of shift