Displaying report 1-1 of 1.
Reports until 17:34, Monday 14 October 2019
LHO VE (VE)
gerardo.moreno@LIGO.ORG - posted 17:34, Monday 14 October 2019 (52466)
X-Mid Vacuum Update

This morning continued to pump down IP10 volume, then after lunch conbined IP10's volume with the X-Mid main volume.  IP10 power cables were attached, including the ground cable. 

The turbo pump will continue with the pump down, and tomorrow we'll leak test the last modified conflat.