Starting where I stopped yesterday, I continued to adjust the mode matching lenses. Unfortunately, no matter how I adjuted the lens positions I could not improve the power transmitted through the PMC. Therefore I returned the lens positions to where I started this morning (same as where I ended yesterday).
I believe the degradation in PMC Trans is due to a slight alignment shift through the 70W amplifier. I base this on the beam profile I took yesterday. When compared to the one from November 2018 (the last time we tweaked the alignment through the 70W amp) the beam is not as round as it was. Last November the horizontal beam width was 0.69% larger than the vertical; now the horizontal beam width is ~3% larger than the vertical. In addition, the halo around the beam is brighter than previous. To fix this we would need to realign the beam through the amplifier, which would then cause a full realignment of the beam path from the 70W amp to the PMC; this would interrupt all work on the IFO for a few days (PMC and FSS unlocked, ISS AOM removed for alignment). Before launching on this I spoke with Betsy and Keita. We decided that there was no rush to launch on this effort for a few reasons:
So, that's where things stand right now. While we are seeing less light through the PMC, this is not a critical issue worth bringing other necessary work to a stand-still over. I will continue to monitor the PMC and will continue to take necessary preventive maintenance actions when required. Thus ends the H1 PSL work for the October 2019 break.