H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:05, Tuesday 15 October 2019 (52495)
Ops Day Shift Summary
Ops Shift Log: 10/15/2019, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Unlocked  
Intent Bit: Engineering
Support: N/A
Incoming Operator: N/A
Shift Summary: Vent recovery continues. The commissioning team has started working on relocking.
 
Activity Log: Time - UTC (PT)
14:00 (07:00) Hugh – Wind fence drilling team working at End-X
14:00 (07:00) Ace Septic – On site for annual septic check and pumping
14:49 (07:49) Ken – Going to End-X
14:50 (07:50) Vanessa – Going to End & Mid-X for cleaning
14:55 (07:55) Tyler & Chris – Moving turbo pump from Mid-X to the CS
15:00 (08:00) Strat of Shift
15:08 (08:08) Gerardo – Going to HAM5/6 for pump down work
15:10 (08:10) Unifirst on site
15:14 (08:14) Christina – Going into the LVEA
15:18 (08:18) Jeff B. – Going to both ends and corner to check HEPI pumps and dust monitor pumps
15:45 (08:45) Timesh – NCal work in Optics Lab
15:50 (08:50) Norco – LN2 delivery to CP1
15:52 (08:52) Filiberto – BRS cabling at End-Y
16:00 (09:00) Ken – Electrical work at End-Y
16:26 (09:26) Jason – Going into the PSL Enclosure for PMC Mode Matching
16:27 (09:27) Cheryl & Ethan – Going into The PSL Enclosure for clipping investigation
16:31 (09:31) TJ& Aidan – Going into the Optics Lab
16:47 (09:47) Chris & Tyler – Finished moving Turbo pumps to CS High Bay
16:48 (09:48) Tyler & Chris – Opening High Bay rollup to move in Turbo pumps
                        Craning Turbo pumps over the beam tube
17:00 (10:00) Cleaning crew in the PSL Enclosure
17:19 (10:19) Dick G. – Going into the CER and LVEA for RF checks (WP #8420)
17:43 (10:43) Chris & Tyler – Out of the LVEA
17:43 (10:43) Aidan & TJ – Out of the Optics Lab
17:45 (10:45) Norco – LN2 delivery to CP8
17:46 (10:46) Eric – Going to End-Y to get equipment
17:50 (10:50) Cleaning crew out of the PSL Enclosure
17:55 (10:55) Aidan & TJ – Going to End-Y testing HWS laser
18:00 (11:00) Cheryl & Ethan – Going into the PSL Enclosure
18:09 (11:09) Eric – Back from End-Y
18:11 (11:11) Drink Machine service on site
18:32 (11:32) Betsy – Taking equipment to Mid-X
18:53 (11:53) Gerardo & Kyle – Finished with moving equipment from mid stations to CS
                       Leak checking at HMA5/6
19:05 (12:05) Dave & Jim – CS HAM ISI and DAQ restart
20:12 (13:12) Georgia – Going to HAM6 to check on camera
20:16 (13:16) Philippe & Corey – Going to End-X for PEM coil work
20:17 (13:17) Ken – Finished at End-Y
20:17 (13:17) Filiberto – Finished at End-Y
20:17 (13:17) Aidan & TJ – Back from End-Y for lunch
20:30 (13:30) Georgia – Transition HAM5/6 area to local laser hazard
20:45 (13:45) Sheila – Going to HAM5/6
20:54 (13:54) Jim & Filiberto – Going to End-X for BRS Hot pad install
21:00 (14:00) Hanford 200W Shelter in Place – all others keep clear.
21:10 (14:10) Local laser hazard lifted at HAM5/6
21:14 (14:14) Jason, Ethan, Cheryl – Out of the PSL Enclosure
21:20 (14:20) Local laser hazard at HAM1/2
21:25 (14:25) Corey & Philippe – Back from End-X
21:26 (14:26) Georgia – Going into the Optics Lab
21:29 (14:29) Timesh & Ethan – Going to End-X to fit check NCal stuff
21:30 (14:30) Gerardo – VAC is opening GV15
21:31 (14:31) Hanford 200W Shelter in Place has been lifted
21:52 (14:52) Jenne – Going into LVEA to unlock Rotational Stage
21:54 (14:52) Aidan & TJ – Going to End-Y for more HWS work
21:56 (14:56) Jenne – Out of the LVEA
23:00 (16:00) End of Shift

 

 