The LVEA now sits in laser hazard. Cheryl anticipates that this status will remain through the night.
-
Filiberto swapped a power supply in a H1 IO chassis this morning that brought H1SEIH23 back on line.
-
Dust15 alarms: 9:52 AM, 10:53, 11:03, 11:43
-
SUS and SEI alarm at BSC 1 this morning due to SEI work
-
Operator CDS workshop in the control room at noon
-
Laser safety makeup this afternoon
Work permits signed by ops today: 3683 (MC power budget), 3682 (4-hour CDS shutdown next Tuesday for timing network and power distrubution updates).