Reports until 08:13, Wednesday 16 October 2019
H1 General
jeffrey.bartlett@LIGO.ORG - posted 08:13, Wednesday 16 October 2019 (52506)
Ops Day Shift Transition
Ops Shift Transition: 10/16/2019, Day Shift 15:00 – 23:00 (08:00 -16:00) - UTC (PT)
State of H1: Unlocked
Intent Bit: Engineering
Weather:  Skies are partly cloudy with a 20% chance of rain towards afternoon. The winds remain Calm. Temperatures are forecast to reach into the upper 60s.
Primary 0.03 – 0.1Hz: 0.0Xum/s
Secondary 0.1 – 0.3Hz: 0.0Xum/s
Outgoing Operator: N/A
Quick Summary: The commissioning team has started work on relocking. The FMC team is working on removing the doors from the H2 diagonal. The pump down on HAM6 continues.