Reports until 14:19, Thursday 17 October 2019
H1 SQZ
marc.pirello@LIGO.ORG - posted 14:19, Thursday 17 October 2019 (52547)
Installed second of two new AM-AOM Servos in squeezer rack

D. Sigg, M. Pirello

Installed the 2nd new AM-AOM Stabilization Servo for the CLF today.  Some of the cables are very tight in front of this one.  I had to briefly disconnect two squeezer demod cables to squeeze this chassis in.  It might be a good idea to increase the lengths of these cables and dress them to allow for ease of maintenance.

S1900202 is in position for the CLF.

S1900203 is attached to the green pump laser.

ALOG52479