Displaying report 1-1 of 1.
Reports until 16:00, Friday 18 October 2019
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:00, Friday 18 October 2019 - last comment - 17:45, Friday 18 October 2019(52573)
Ops Day Shift Summary
Ops Shift Log: 10/18/2019, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Unlocked
Intent Bit: Engineering
Support: N/A
Incoming Operator: N/A
Shift Summary: Post vent recovery and upgrade work continues.
 
Activity Log: Time - UTC (PT)
14:52 (07:52) Corey – Going to End-Y to setup for the PEM Magnet Coil install
14:58 (07:58) Tyler & Chris – Working on cleanrooms in the West Bay
15:00 (08:00) Start of Shift
15:09 (08:09) Sheila – Working on SRCL
15:11 (08:11) Timesh & Ethan – In the Optics Lab for NCal setup
15:35 (08:35) Filiberto – Pulling iLIGO cables from under BSC2
15:40 (08:40) Timesh, Jason, & Ethan – Going to End-X for NCal install and surveying
15:40 (08:40) Richard – Going into the LVEA
15:45 (08:45) Vanessa – Going to Mid-X and End-X
16:06 (09:06) Philippe & Ian – Going to End-Y to help with Magnet Coil Install
16:10 (09:10) Jeff J. – Sweep of the LVEA
16:12 (09:12) ISI WD Trip in CS – Cable pulling near BSC2 at the time
                      ITM-X, ITM-Y, BS, HAM2, HAM3, HAM4, HAM5, OFI
16:14 (09:14) ISI & SUS WD trip in CS – Cable pulling near BSC2 at the time
                       HAM2, MC3, IM1, IM2, IM3, IM4
16:24 (09:24) TCS-X Laser trip
16:26 (09:26) TCS-Y Laser trip
16:35 (09:35) Aidan – Going into LVEA to reset TCS Lasers
16:37 (09:37) Kyle & Gerardo – Going into LVEA to valve in Vertex RGA
                      Turning of High Voltage as a precaution
16:40 (09:40) Jeff J. – Out of the LVEA
17:00 (10:00) Vanessa – Finished cleaning at Mid-X and End-X
17:33 (10:33) Timesh, Jason, Ethan – Back from End-X
18:18 (11:18) Kyle & Gerardo – Leak checking NEG pumps between HAM4 & HAM5 (WP #8424)
18:23 (11:23) Corey – Back from End-Y
18:24 (11:24) Filiberto – Going to HAM2 to install new fiber to ISCT2
18:31 (11:31) Dave – Model updated for ASC & LSC, and DAQ restart
18:55 (11:55) Philippe & Ian – Back from End-Y
19:03 (12:03) Georgia – Going into the Optics Lab
19:21 (12:21) Filiberto – Out of the LVEA
19:17 (12:17) Georgia & Dripta – Going to End-Y to profile ALS Laser – Will go laser hazard
19:20 (12:20) Timesh – Going to End-X
20:11 (13:11) Kyle – Craning turbo pump over the Y-Beam Manifold
20:37 (13:37) Richard – Going to ICST2 for phase camera communication fiber
20:52 (13:52) Richard – Out of the LVEA
20:55 (13:55) Georgia & Dripta – Coming back from End-Y for lunch – End-Y back to laser safe
20:58 (13:58) Dick G. – Going to the ISCT racks (HAM1/2) for RF checks
21:10 (14:10) Jason, Timesh, Ethan – Going to End-X for NCal install and surveying
21:20 (14:20) Kyle – Finished craning in the LVEA
21:21 (14:21) Dan B. & Cao – Going to ISCT tables – Will be local laser hazard
21:24 (14:24) Philippe & Ian – Going to End-Y for magnet coil install
21:54 (14:54) Georgia & Keita – Going to End-Y to profile ALS laser – Will go laser hazard
22:03 (15:03) Jason – Back from End-X
22:31 (15:31) Ed – Taking visitor on tour of LVEA
22:38 (15:38) Timesh – Back from End-X
23:00 (16:00) End of Shift
Comments related to this report
georgia.mansell@LIGO.ORG - 17:45, Friday 18 October 2019 (52575)

00:30 (17:30) Phillippe, Ian, Keita and I are all back from End-Y. We transitioned the VEA back to laser safe.

Displaying report 1-1 of 1.