TITLE: 10/21 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Jeff
SHIFT SUMMARY:
Flurries of activities on site continue leading up to Gate-Valve opening later this week.
LOG:
- 14:38 - 15:38 Wet drilling in LVEA (kyle)
- This caused dust which was also seen in the PSL.
- 15:55 DRMI guardian node taken to DOWN since it was trying to lock from over the weekend (Sheila requested this)
- 17:01 HAM6 Laser HAZARD: NO WORK AT HEIGHT unless you wear laser goggles
- 17:24-17:52 @EY checking HWS laser work (TJ)
- 17:25 TCS HV & access system work (fil)
- 17:26-19:00 Camera set-up work (cheryl)
- 17:31-19:45 @EX fit check for NCal (Timesh, Gavin)
- 17:40 @LVEA NEG pump work for OMC (wear laser goggles, if needed) (gerardo)
- 17:43 @LVEA cleaning CR curtains & will hang via genie lift (wearing laser goggles when at height) (christina)
- 17:54 @Optics Lab Fume Hood ON!! (hugh, vanessa)
- 18:20 TCS Chiller maintenance check (jeff b)
- 18:23 @HAM6 running cables (marc)
- 19:06-19:28 @EY Pcal alignment check (niko, ethan)
- 19:06 Squeezer work (nutsinee)
- 19:44-21:05 @LVEA Terminating PEM Coil (fil)
- 20:50 @EY for coil work? (philippe)
- 21:06-22:11 @EX Terminating PEM Coil (fil)
- 21:31 @EX ALS beam comparison [to EY] (georgia.keita)
- 21:49 EX transitioned to Laser HAZARD (georgia)
- 22:11 @EY Terminating PEM Coil (fil)
- 23:00 Switched ISI CONFIG back to TEST_SWARM state for commissioners.