patrick.thomas@LIGO.ORG - posted 16:22, Tuesday 22 October 2019 (52628)
Ops Day Shift Summary
TITLE: 10/22 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
LOG:

h1susex down upon arrival
14:53 UTC Karen to end Y
14:58 UTC Set SEI_CONF to SC_OFF_NOBRSXY
15:08 UTC Jeff B. to LVEA to retrieve dust monitors and contamination control kits
15:15 UTC Paradise Water through gate
15:22 UTC Jeff B. back
15:30 UTC Vanessa to mid X and end X
15:41 UTC Dave investigating h1susex
15:44 UTC Dave restarting h1susex
15:49 UTC DOE well sampling through gate
15:52 UTC Timesh to end X for NCAL drilling
15:57 UTC Dave power cycling h1susex after taking out of Dolphin
15:59 UTC Karen done at end Y
16:10 UTC Christina driving down arms to collect Norco receipts
16:17 UTC Dave done bringing h1susex back
16:23 UTC Timesh back
16:30 UTC Corey to optics lab
16:35 UTC I started work on h1brsey
16:40 UTC Ken to LVEA looking for ladder
16:40 UTC Travis to cleaning area, putting plastic box back
16:44 UTC Filiberto re-enabling HAM6 HV
16:46 UTC Travis back
16:54 UTC HV back on
16:55 UTC DOE is done well testing
17:04 UTC Vanessa done at mid and end X, going to LVEA
17:11 UTC Karen to LVEA
17:11 UTC LN2 delivery
17:40 UTC Nutsinee to squeezer area
17:41 UTC Tyler at end X starting drilling for NCAL
17:42 UTC Timesh to end X
17:51 UTC Niko to optics lab
17:59 UTC Georgia and Keita to end Y
18:00 UTC Niko out of optics lab
18:29 UTC Chris to LVEA to retrieve rotohammer
18:28 UTC Dave restarting TCS model
18:31 UTC Jim taking corner BSCs offline in prep for model restarts
18:32 UTC Dave, Jim restarting h1isiitmy, h1isibs, h1isiitmx
18:43 UTC DAQ restart
19:08 UTC Ken to LVEA looking for extension ladder
19:16 UTC Dan to ISCT1 to retrieve equipment
Greg: DMT OS upgrade WP 8435
19:53 UTC Keita and Georgia back
20:05 UTC Richard and Ken to LVEA to search for ladder
20:08 UTC Corey and Hugh to HAM7
20:08 UTC Filiberto to end Y (WP 8440)
20:12 UTC Richard and Ken back
20:16 UTC Nutsinee to squeezer bay
20:16 UTC Phillipe and Ian to end stations, magnetic coils
20:18 UTC Dave to end Y
20:40 UTC Dave back from end Y
21:29 UTC Corey back from LVEA
21:48 UTC Hugh back from LVEA
21:58 UTC Dan to ISCT1, installing equipment for phase camera
22:03 UTC Tyler done
22:11 UTC Timesh and Gavin to end X to bolt NCAL anchor in place
22:27 UTC Kyle called to report that the rooms he has been in appear warmer than usual
22:30 UTC Nutsinee back. Dave restarting DAQ.
23:06 UTC Phillipe and Ian back