H1 General
jeffrey.bartlett@LIGO.ORG - posted 15:05, Wednesday 23 October 2019 (52656)
Ops Day Shift Summary
Ops Shift Log: 10/23/2019, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Unlocked
Intent Bit: Engineering
Support: N/A
Incoming Operator: N/A
Shift Summary: Locking, repairs, upgrades, and post-vent recovery continues
 
Activity Log: Time - UTC (PT)
15:00 (08:00) Start of Shift
15:10 (08:10) Crane inspection crew on site
15:17 (08:17) Vanessa – Going to Mid-X and End-X for cleaning
15:33 (08:33) Patrick – Working in the H2 building
15:42 (08:42) Chris – Delivering cleaned shackles to the LVEA
15:53 (08:53) Richard – Opening the ALS shutter
15:54 (08:54) Gerardo – Working on the NEG pumps
15:55 (08:55) Christina – Going to End-Y
16:00 (08:00) Filiberto – Pulling AA chassis in ISCC1 rack for modification
16:13 (09:13) Carlos – Rebuilding the CDSADMIN Control computer
                       Remote access off line
16:30 (09:30) Karen – Cleaning at End-Y
17:40 (09:40) Carlos – Finished with CDSADMIN rebuild
17:05 (10:05) Cao – Going to get equipment from IO table
17:09 (10:09) Karen – Finished at End-Y – Checking Mid-Y before returning to CS
17:21 (10:21) Philippe & Ian – Going to both end stations to work on OEM magnetic coil
17:24 (10:24) Filiberto – EE crew has modified the chassis and they have been reinstalled.
17:25 (10:25) Karen finished at Mid-Y coming back to the Corner Station
17:34 (10:34) Vanessa – Going into the LVEA
17:51 (10:51) Karen – Going into the LVEA
17:52 (10:52) Sheila & Nutsinee – Going to HAM6 for Squeezer work – Will NOT go laser hazard
17:55 (10:55) Hugh & Corey – Finished with CS HEPI accumulator checks – Out of the LVEA
17:56 (10:56) Filiberto – Going to End-Y to remove and modify illuminator chassis (Beckhoff)
18:30 (11:30) Hugh & Corey – Servicing End-X HEPI pump station
18:45 (11:45) Hugh & Corey – Finished with HEPI at End-X
18:50 (11:50) Dan – Going to ISCT1 to install phase curvature plate
18:57 (11:57) Hugh & Corey – Servicing End-Y HEPI pump station
19:18 (12:18) Hugh & Corey – Finished with HEPI pump station service
19:27 (12:27) Corey – Checking PSL Chillers
19:38 (12:38) Corey – Finished with PSL chillers
19:52 (12:52) Dan B. – Out of the LVEA
19:56 (12:56) Tyler – Moving scissor lift out of the LVEA via rollup dor to High Bay
19:59 (12:59) Filiberto – Finished at End-Y
20:12 (13:12) Greg – Patching and booting DMT servers
20:22 (13:22) Sheila & Nutsinee – Out of the LVEA
20:20 (13:20) Timesh – Going to End-X to recover parts
20:23 (13:23) Richard – Going into CER to check fiber link
20:27 (13:27) Marc – Going into the LVEA to verify cabling names and numbers
20:46 (13:46) Georgia – Going into the Optics Lab
20:48 (13:48) Dave – DAQ restart
21:01 (14:01) Georgia – Out of the Optics Lab
21:04 (14:04) Timesh – Back from End-X
21:33 (14:33) Mike – Taking Caltech security down the X arm
22:00 (15:00) End of Shift – Attend Ops meeting