Displaying report 1-1 of 1.
Reports until 16:15, Thursday 24 October 2019
LHO General
patrick.thomas@LIGO.ORG - posted 16:15, Thursday 24 October 2019 (52687)
Ops Day Shift Summary
TITLE: 10/24 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
LOG:

Gate valves are open. Commissioners are working on re-locking.

15:09 UTC Ken to end X electronics bay working on wall brackets
15:31 UTC Sheriff through gate
16:13 UTC Caltech security through gate
16:16 UTC Jim cleared test point on h1isietmx
16:25 UTC Vlad and Niko to optics lab
16:43 UTC Karen to mid Y
16:47 UTC Robert to end X
16:49 UTC Ethan and Niko to end Y to check PCAL alignment
16:59 UTC Niko transitioning end Y to laser hazard
17:10 UTC Niko and Ethan done at end Y, VEA back to laser safe
17:25 UTC Karen done at mid Y, going to end Y
17:49 UTC Karen done at end Y
18:23 UTC Stone Soup through gate
18:43 UTC Marc taking students on tour of LVEA
19:02 UTC Ken done at end X
19:06 UTC Marc and students out of LVEA
19:47 UTC h1seiproc model restart
19:59 UTC Ken to end Y
20:21 UTC Kyle climbing on HAM6
20:23 UTC DAQ restart
20:49 UTC Phillipe and Ian to end Y to set up magnetometer measurements
21:03 UTC Filiberto disconnected Beckhoff outputs for illuminator and table lights at end Y
21:09 UTC Meeting with Benton County sheriff is done
21:12 UTC Jason, Ethan, Timesh to end X, NCAL surveying
21:22 UTC Gerardo to HAM5 to tap on ion pump
21:24 UTC Travis to LVEA to look for charger
21:30 UTC Travis done
21:30 UTC Kyle done
21:31 UTC Filiberto done
21:37 UTC Ian and Phillipe back
21:53 UTC Jason back
22:00 UTC Timesh back
22:05 UTC Travis to mid X
22:15 UTC Filiberto back to end Y to reconnect Beckhoff outputs
22:22 UTC Ken done at end Y
23:10 UTC Gerardo back
Displaying report 1-1 of 1.