TITLE: 10/24 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC STATE of H1: Planned Engineering LOG: Gate valves are open. Commissioners are working on re-locking. 15:09 UTC Ken to end X electronics bay working on wall brackets 15:31 UTC Sheriff through gate 16:13 UTC Caltech security through gate 16:16 UTC Jim cleared test point on h1isietmx 16:25 UTC Vlad and Niko to optics lab 16:43 UTC Karen to mid Y 16:47 UTC Robert to end X 16:49 UTC Ethan and Niko to end Y to check PCAL alignment 16:59 UTC Niko transitioning end Y to laser hazard 17:10 UTC Niko and Ethan done at end Y, VEA back to laser safe 17:25 UTC Karen done at mid Y, going to end Y 17:49 UTC Karen done at end Y 18:23 UTC Stone Soup through gate 18:43 UTC Marc taking students on tour of LVEA 19:02 UTC Ken done at end X 19:06 UTC Marc and students out of LVEA 19:47 UTC h1seiproc model restart 19:59 UTC Ken to end Y 20:21 UTC Kyle climbing on HAM6 20:23 UTC DAQ restart 20:49 UTC Phillipe and Ian to end Y to set up magnetometer measurements 21:03 UTC Filiberto disconnected Beckhoff outputs for illuminator and table lights at end Y 21:09 UTC Meeting with Benton County sheriff is done 21:12 UTC Jason, Ethan, Timesh to end X, NCAL surveying 21:22 UTC Gerardo to HAM5 to tap on ion pump 21:24 UTC Travis to LVEA to look for charger 21:30 UTC Travis done 21:30 UTC Kyle done 21:31 UTC Filiberto done 21:37 UTC Ian and Phillipe back 21:53 UTC Jason back 22:00 UTC Timesh back 22:05 UTC Travis to mid X 22:15 UTC Filiberto back to end Y to reconnect Beckhoff outputs 22:22 UTC Ken done at end Y 23:10 UTC Gerardo back