TITLE: 10/25 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC STATE of H1: Planned Engineering LOG: 14:32 UTC Vanessa to LVEA 14:49 UTC Ken to end X, looking for jacket 15:05 UTC Ken back from end X 15:29 UTC Hugh to optics lab, using fume hood 15:31 UTC Vanessa to end X 15:45 UTC Ken driving genie lift to squeezer bay to put brackets up for magnetic coils 16:02 UTC Ken back 16:05 UTC Ken back to LVEA 16:11 UTC Corey, Robert, Phillipe to cleaning area to put up magnetic coils. Opening rollup door to move coils from receiving area 16:14 UTC Karen to end Y, not VEA 16:24 UTC Karen done at end Y 17:15 UTC Richard to LVEA 17:55 UTC Kyle and Gerardo to LVEA to continue assembling turbo pumps 18:01 UTC Travis to mid X to look for cable tray parts 18:23 UTC Corey, Robert, Phillipe done 18:33 UTC Travis back from mid X 18:40 UTC Phillipe to LVEA to move equipment 18:57 UTC Gerardo out for lunch 19:00 UTC Ken done 19:18 UTC Kyle out for lunch 19:32 UTC Phillipe done in LVEA 19:48 UTC Ken back to LVEA 20:19 UTC Travis and Kyle to LVEA 20:24 UTC Travis to mid X 20:41 UTC Travis back 21:04 UTC Kyle done for day 21:10 UTC Robert and team installing coils for magnetic injections in squeezer bay 21:25 UTC Daniel to squeezer bay 22:08 UTC Phillipe out of LVEA 22:10 UTC Dan to ISCT1