Reports until 16:06, Friday 25 October 2019
LHO General
patrick.thomas@LIGO.ORG - posted 16:06, Friday 25 October 2019 (52695)
Ops Day Shift Summary
TITLE: 10/25 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
LOG:

14:32 UTC Vanessa to LVEA
14:49 UTC Ken to end X, looking for jacket
15:05 UTC Ken back from end X
15:29 UTC Hugh to optics lab, using fume hood
15:31 UTC Vanessa to end X
15:45 UTC Ken driving genie lift to squeezer bay to put brackets up for magnetic coils
16:02 UTC Ken back
16:05 UTC Ken back to LVEA
16:11 UTC Corey, Robert, Phillipe to cleaning area to put up magnetic coils. Opening rollup door to move coils from receiving area
16:14 UTC Karen to end Y, not VEA
16:24 UTC Karen done at end Y
17:15 UTC Richard to LVEA
17:55 UTC Kyle and Gerardo to LVEA to continue assembling turbo pumps
18:01 UTC Travis to mid X to look for cable tray parts
18:23 UTC Corey, Robert, Phillipe done
18:33 UTC Travis back from mid X
18:40 UTC Phillipe to LVEA to move equipment
18:57 UTC Gerardo out for lunch
19:00 UTC Ken done
19:18 UTC Kyle out for lunch
19:32 UTC Phillipe done in LVEA
19:48 UTC Ken back to LVEA
20:19 UTC Travis and Kyle to LVEA
20:24 UTC Travis to mid X
20:41 UTC Travis back
21:04 UTC Kyle done for day
21:10 UTC Robert and team installing coils for magnetic injections in squeezer bay
21:25 UTC Daniel to squeezer bay
22:08 UTC Phillipe out of LVEA
22:10 UTC Dan to ISCT1