Reports until 08:22, Monday 28 October 2019
H1 General
yannick.lecoeuche@LIGO.ORG - posted 08:22, Monday 28 October 2019 (52734)
Ops Day Shift Transition

Ops Shift Transition: 10/28/2019, Day Shift 15:00 – 23:00 (08:00-16:00) - UTC (PT)

State of H1: Planned Engineering

Intent Bit: Commissioning

Weather: 0-5 mph wind

Primary 0.03 – 0.1Hz: 0.01 um/s

Secondary 0.1 – 0.3Hz: 0.2 um/s

Outgoing Operator: None

Quick Summary: Sheila is in the process of locking the IFO, at TRANSITION_FROM_ETMX