Shift Summary - Day

TITLE: 10/28 Day Shift 15:00 – 23:00 (08:00-16:00), all times posted in UTC

STATE of H1: Planned Engineering

INCOMING OPERATOR: None

SHIFT SUMMARY: Locked shortly after shift start, lost lock around 10:30. Had trouble re-locking, Sheila aligned IM3 and PR3 to increase COMM beatnote. Lost lock again about 2.5 hours later, likely due to PEM injections. Re-locking, currently at ACQUIRE_DRMI_1F.

LOG:

15:06 (08:06) Tyler driving forklift outside corner station

15:11 (08:11) Tyler finished

15:42 (08:42) Vlad to Optics Lab

16:53 (09:53) Robert, Phillipe to LVEA

16:54 (09:54) Jeff to mechanical room - check TCS chillers

16:58 (09:58) Patrick to H2 -- IO chassis testing

17:03 (10:03) Hugh to Optics Lab -- open fume hood for evaluation

17:04 (10:04) Jeff back from mechanical room

17:30 (10:30) Lockloss from NLN

17:55 (10:55) Timesh, Gavin to EX -- pick up NCAL equipment

18:04 (11:04) Richard to MX, MY -- find cable

18:24 (11:24) Timesh, Gavin back from EX

18:25 (11:25) Timesh, Gavin to Optics Lab -- drop off equipment

18:27 (11:27) Richard back from mid-stations

18:29 (11:29) Timesh, Gavin back from Optics Lab

18:56 (11:56) Patrick back from H2 building

19:17 (12:17) Robert, Dan to LVEA -- look at ISCT1

19:26 (12:26) Robert, Dan out of LVEA

19:29 (12:29) Jeff, Charles to Optics Lab -- look at chemicals

19:30 (12:30) Patrick to H2 building -- continue testing

19:46 (12:46) Patrick back from H2

19:48 (12:48) Hugh, Jeff out of Optics Lab

21:44 (14:44) Sheila, Lee to LVEA -- look for GPIB adapter near PSL racks

22:03 (15:03) Betsy to Optics Lab

22:35 (15:35) Sheila to LVEA -- clear out troublemakers

22:40 (15:40) Sheila out of LVEA