Displaying report 1-1 of 1.
Reports until 11:08, Tuesday 29 October 2019
H1 PSL
jason.oberling@LIGO.ORG - posted 11:08, Tuesday 29 October 2019 - last comment - 11:18, Tuesday 29 October 2019(52763)
PSL PMC/RefCav Beam Alignment Tweak and Power Watchdog Reset (FAMIS 10734)

In advance of the imminent start of O3b, I have tweaked the beam alignment into both the PMC and FSS RefCav.  All tweaking was done with the ISS OFF.

After turning the ISS back on, I noticed the % diffracted power was down around 1.4%; this is below our 2% minimum, so I adjusted the ISS Ref Signal from -2.01V to -2.0V, which brought the % diffracted power back up to ~2%.  This change was accepted in both the safe.snap and OBSERVE.snap SDF files.  With the ISS back ON the PMC is now transmitting 53.3 W.

I also reset both PSL power watchdogs at 18:05 UTC (11:05 PDT).  This completes FAMIS 10734.

Comments related to this report
jason.oberling@LIGO.ORG - 11:18, Tuesday 29 October 2019 (52766)

In addition to the above, while resetting the PSL power watchdogs the PSL Beckhoff Status screen was showing a 'Check Diode Chiller' warning.  Heeding said warning, I checked on the diode chiller; it was showing a 'Low Water Level' warning, which went away while I was taking the cap off of the reservoir (this is an indication that the chiller is right on the edge of being low on water; the timing with me removing the cap was coincidence).  I added 500mL of water to the diode chiller and did not observe the low water level warning again.