TITLE: 10/29 Day Shift 15:00 – 23:00 (08:00-16:00), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Maintenance ran into a few hiccups with the PT-110 electronics swap not working and the BRS heater not heating. Locking in earnest began around 2pm, but we are back to initial alignment after not being able to acquire PRMI.
LOG:
14:30 (07:30) Hugh to Optics Lab -- fume hood work
14:42 (07:42) Vanessa to LVEA
14:59 (07:59) Karen to EY
15:00 (08:00) Jeff to End stations -- check HEPI pumps, dust monitors
15:00 (08:00) Vlad to Optics Lab
15:45 (08:45) Jim, Fil to EX -- BRS heater work
15:51 (08:51) Chandra to LVEA -- replace PT-110, soft close GV1/2
16:00 (09:00) Richard, Patrick to EY -- check ESD driver
16:11 (09:11) Karen leaving EY
16:12 (09:12) Jeff to EX -- continue HEPI pump/dust monitor checks
16:26 (09:26) Timesh to Optics Lab
16:44 (09:44) Phillipe, Gavin to EX, EY -- test PEM coils
16:46 (09:46) Jeff back from EX
16:59 (09:59) Chandra to LVEA -- soft close GV5/7, open GV1/2 for RGA scan
17:17 (10:17) Richard, Patrick back from EY
17:21 (10:21) Dave, Timesh to EX -- Ncal installation prep
17:32 (10:32) Dick to CER -- RF leakage work
17:33 (10:33) Jason to PSL enclosure -- PMC tuneup
17:51 (10:51) Richard to LVEA -- test PT-110 gauge
17:52 (10:52) Gavin back from EX
17:56 (10:56) Chandra to LVEA -- soft close GV5, open GV1, test PT-110
18:00 (11:00) Marc to CER -- work with Dick
18:22 (11:22) Marc out of CER
18:39 (11:39) Phillipe back from EX/EY
18:40 (11:40) Phillipe to LVEA -- check cables
18:58 (11:58) Phillipe out of LVEA
19:00 (12:00) TJ back from EY
19:12 (12:12) Robert, Phillipe out of LVEA
19:21 (12:21) Nutsinee to LVEA -- log out of computer
19:28 (12:28) Kyle out of LVEA
19:28 (12:28) Nutsinee out of LVEA
19:44 (12:44) TJ to LVEA -- sweep
19:55 (12:55) Richard to LVEA -- turn off transformer
19:57 (12:57) Timesh to Optics Lab
20:04 (13:04) Richard out of LVEA
20:30 (13:30) Kyle to LVEA
20:54 (13:54) Jeff finished moving chemicals
21:01 (14:01) Richard to CER -- check on HV bypass
21:32 (14:32) Timesh to Optics Lab
22:12 (15:12) Jim back from EX
22:27 (15:27) Nutsinee to SQZT6 -- replace diode
22:47 (15:47) Timesh to Optics Lab
23:02 (16:02) Nutsinee out of LVEA