SUS finished the installation (swapping out defective OSEM and rebuilding the flag mounts on the Top Mass) of the OSEMs in the FM Top mass and Penultimate mass. All ten OSEMs in FM1 have been aligned, centered, and zeroed. Mark B. is starting the testing cycle