Reports until 17:58, Friday 04 February 2011
H2 INS
patrick.thomas@LIGO.ORG - posted 17:58, Friday 04 February 2011 - last comment - 08:38, Saturday 05 February 2011(529)
Ops Day Summary
Oscar was bailing tumbleweeds
Work was done on the automatic raising and lowering of the clean room over HAM6
Dani took Greg, Mark and Bram on a laser safety tour of the LVEA
The H1 PSL was turned on for the squeezer experiment
Comments related to this report
john.worden@LIGO.ORG - 08:38, Saturday 05 February 2011 (530)
Actually, "motorized" would be a better term than "automatic". For the BSC cartridge install we need the ability to lower the cleanroom to make room for craning the cartridge overhead. Since the crane is occupied with the cartridge we need an alternate mechanism to lower and raise the cleanroom. The prototype system is being tested at the HAM6 cleanroom.