Ops Owl Shift Summary
Ops Shift Log: 11/02/2019, Owl Shift 07:00 – 15:00 (00:00 - 08:00) Time - UTC (PT)
State of H1: Locked at NLN
Intent Bit: Observing
Support: N/A
Incoming Operator: Cheryl
Shift Summary: The IFO has been observing for the past 8.75 hours. Things have mostly been good all shift. There was a 10Mpc drop in range around 13:30 (05:30). There is a bit of noise at higher frequency, which has been around most of the morning. The Squeezer appears to be working. Microseism and environmental conditions are good. Leaving this one to the commissioning team to sort out.  
 
Activity Log: Time - UTC (PT)
07:00 (00:00) Take over from Patrick
15:00 (08:00) Turn over to Cheryl