TITLE: 11/02 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC STATE of H1: Observing at 115Mpc INCOMING OPERATOR: Jeff SHIFT SUMMARY: Remained locked entire shift. Squeezer took us out of observing for about a minute. Craig fixed the high frequency noise by increasing the FSS gain. Robert, Dan, Craig and Cao fixed the scattering shelves by unplugging the CMOS camera on ISCT1. LOG: 22:53 UTC Out of observing for phase camera fan test 22:55 UTC Dan and Robert to ISCT1 23:11 UTC Robert and Dan back. Craig adjusting FSS gain. 23:17 UTC Back to observing 00:04 UTC Dropped out of observing by squeezer 00:05 UTC Back to observing 05:15 UTC Dust alarm at end Y