Displaying report 1-1 of 1.
Reports until 08:06, Sunday 03 November 2019
H1 General
jeffrey.bartlett@LIGO.ORG - posted 08:06, Sunday 03 November 2019 (52938)
Ops Owl Shift Summary
Ops Shift Log: 11/03/2019, Owl Shift 07:00 – 16:00 (00:00 - 08:00) Time - UTC (PT)
State of H1: Locked at NLN; Range is 115.0Mpc
Intent Bit: Observing
Support: Kyle
Incoming Operator: Cheryl
Shift Summary: IFO was locked and observing for entire shift. Switched to Standard Time 10:00 (02:00).
Switched to EARTHQUAKE Mode for a M5.4 in Chile. Switched back after waves passed.
Received Low Pressure Alarm on PT-199 Instrument Air. Pressure dropped into the mid 40PSIG. Spoke with Kyle. Put compressor #1 into manual (Hand) and built pressure up to 95PSIG, while Kyle was coming out to the site. Kyle is on site now looking into the problem.
 
A Big Thank You to Cheryl for coming in early to help cover the time switch!
 
Activity Log: Time - UTC (PT)
07:00 (00:00) Take over from Patrick
10:00 (02:00) Switch to Standard Time
13:45 (05:45) Switch to EARTHQUAKE for M5.4 from Chile
14:11 (06:11) Switch back to WINDY after EQ passed
15:00 (07:00) Turn over to Cheryl

 

Displaying report 1-1 of 1.