TITLE: 11/05 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Earthquake
INCOMING OPERATOR: Jim
SHIFT SUMMARY: Lost lock due to an earthquake during calibration measurements. Waiting for the earth to ring down, but attempting to lock green arms.
LOG:
Future Operators: If the squeezer drops and will not relock on its own, bring the SQZ_CLF_LR node to DOWN and then once that state has complete, bring it back to LOCKED. If this doesn't work after a few attempts, then it might be another issue.