Work discussed in the morning meeting: BSC1: Hugh, Apollo: attach HEPI actuators Doug: Check alignment after HEPI actuators attached MC: Recheck IMC cavity pole measurement Hugo: Install blend filters for HAM2,3. BS test stand: Jim: Replace 2 broken Trillium sensors Betsy: Move suspension HAM6: Greg, Apollo: HEPI install LVEA: Richard: Rebalance DC power load on ISC racks HAM2,3: Filiberto: Illuminator install EY: Kyle: Vent chambers No Praxair delivery ----- Replacement of floor mats Sprague Delivery for Ken Dust monitor at location 4 moved into BSC2 cartridge test stand with BS 1:01 Filiberto attached power to HEPI 3:04 Cheryl to close the PSL laser shutter to realign camera on top of HAM 2 Daniel working on h1ecatc1 and h1ecatex Beckhoff computers Kyle began a slow vent at end Y. link Filiberto ran power cables for and installed illuminators in HAM2 and 3. link All the front end computers and associated IO chassis were shutdown except for the test stands and mid X. Richard redistributed the DC power at the ISC rack. The fiber optics ports of the timing system were reconfigured to match LLO. link 2:18 - 4:11 Dan upgraded the firmware on the SATABOY controllers in the MSR link Dave modified the h1ascimc model link The glass BS optic was put in the suspension on the test stand link The last of the HEPI actuators were attached to BSC1 link The PSL laser was accidentally tripped and shutdown. Michael R. swapped out water filters for the diode chillers. link ----- Signed work permits: 3687-3690