Tyler G. Chris S. Run time from approx. 9:45a-11:58a Despite its reluctancy to wake up on this frigid November morning, "Big Green" was put to work during our maintenance window clearing large piles of tumbleweeds. Predominately on the X arm beginning at the mid station with one nearly impassable section just before the end station. With the falling temps I expect tumbleweed build-up to be a regular occurrence in the coming months. So as a PSA (NOT motivated by any incident or near miss) please allow plenty of space when traveling ahead of or behind Big Green. It is large, noisy and generally commands that the operators attention be forward during processing. Unless specifically called to pass by the operator, please do not attempt to pass alongside of the equipment. We will be mindful of traffic and pull off whenever possible.
Tagging facilities (FMCS) found under LHO section.