Ed, Camilla
TITLE: 11/08 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 107Mpc
INCOMING OPERATOR: Cheryl
SHIFT SUMMARY:
- Experimenting with squeezer gain and phase settings because of range drop. aLog
- Heavy equipment for the wind fence was staged by the fire tank
- Jeff Jones brought the vendors for said wind fence to the end stations
LOG: