Four pieces of equipment were brought on site today in preparation for wind fence construction activity next Monday 11 Nov 2019: cart, backhoe, fork truck and crane truck. Those that were brought on a flatbed were offloaded outside the gate and slowly driven past the corner station to be parked for now near the fire water tank. Photos attached. Additionally, grout and rebar vendors visited for walkdowns and pre-activity discussions.