TITLE: 11/12 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 115Mpc
INCOMING OPERATOR: Ed
SHIFT SUMMARY: Heay equipment for the wind fence was on site today, clearly visible on the seismometers and in our range. There is more work expected for tomorrow as well. We had 2 hours of calibration time, and an earthquake that rolled through at the end of it. We made it through but Seismon says that another M5.9 should be here shortly. We will keep SEI_CONF in its Earthquake state until this one has passed.
LOG:
- 1621 Tyler and Chris starting the chiller work to help damp the 35hz noise from the chiller.
- 1639 Tyler and Chris done
- 1703 Karen to MY
- 1730 Karen leaving My
- 1738 Tyler fork lifting pallets near fire tank
- 1952 Vanessa to MX
- 2011 Jeff J to EX to check on wind fence crew.
- 2132 Out of Observing to start Calibration
- 2135 Back to Observing, too hasty starting calibration
- 2200 Out of Observing for Calibration
- 2215 Jim and Eyal changing settings on the BRSX heater.
- 2215 Conner and Kiara changing PRCL calibration
- 2242 Jeff J to Ex to check on wind fence
- 2312 Jeff J back
- 2315 Kyle to MY
- 2323 Switching SEI_CONF to EARHTQUAKE for a M6.1 near Tonga
- 2341 Kyle back
- 2355 Observing